Every day we face multiple challenges in different sectors.
Thanks to our passion and professionalism we manage to reach our customers’ goals.
Extraordinary intervention at Pontremoli hydroelectric plant for the replacement of a 12-quintal generator.
Assembly of aluminum rolling mill with gantry crane with beams at height (from 6 m to 21 m) and variable width (from 8 m to 18 m).
Gucci, a global and established name of the high fashion world, has availed itself of our exceptional transport, lifting and positioning services for the new sign of the store in via Monte Napoleone, Milan.
Aiming to improve the performance of its services, Battazza Spa expands its lifting vehicles fleet with the new Grove GMK5250 XL-1 multi-terrain crane, a unique and ideal vehicle for high-altitude performance.
SC Centro Meridiana Lecco, the management body of a well-known real estate complex located in the heart of Lecco, availed itself of our services to organize the transfer of 5 sculptures, “Shingu sails” from the top of the towers of the Center.
The execution of the assignment was preceded by a series of preliminary technical activities, including a careful analysis of the route, inspections and study of the most correct lifting and towing methods, as well as administrative and insurance checks.
The construction of the new logistics platform required an investment of 600 thousand euros. It extends over 110 meters in length and 12 in width. The plant has a stacking capacity of approximately 3700 tons.