CASE HISTORY
BATTAZZA S.p.A.
Generator replacement using helicopter
Location: Pontremoli (MS)
Extraordinary intervention at Pontremoli hydroelectric plant for the replacement of a 12-quintal generator. The operation involved the use of a helicopter to extract the old generator and place the new one in an area that was inaccessible to traditional means. In support, a tractor with a crane behind the cabin was used for loading, transporting and unloading the machinery at a point suitable for collection by the helicopter.
other case histories in
Lifting and assembly
Generator replacement using helicopter
Extraordinary intervention at Pontremoli hydroelectric plant for the replacement of a 12-quintal generator.
29 May, 2025Aluminum rolling mill assembly
Assembly of aluminum rolling mill with gantry crane with beams at height (from 6 m to 21 m) and variable width (from 8 m to 18 m).
07 May, 2025



